Incendiary Arts

integrated multimedia

system design, sales & installation

Incendiary Arts Logo
all
art

Cary Institute auditorium upgrade phase 1

10/15/2017

The first phase of installing an upgrade we designed for the Cary Institute of Ecosystem Studies auditorium has been completed. The new system completely replaces the old audio system, changes all the house lighting to LED with new dimming and controls, replaces the video projector and adds video lighting for new PTZ video cameras with switching and recording for lectures and other functions.

Here is Fred Merritt, Cary Institute Facilities Director checking in on us. Directly above him are the new house right lighting position and “delay” speaker.

Here is an image showing the custom rigging we designed and installed to support the main JBL CBT arrays. The amps are Crown and the DSP Symetrix.