Cary Institute auditorium upgrade phase 1
10/15/2017
The first phase of installing an upgrade we designed for the Cary Institute of Ecosystem Studies auditorium has been completed. The new system completely replaces the old audio system, changes all the house lighting to LED with new dimming and controls, replaces the video projector and adds video lighting for new PTZ video cameras with switching and recording for lectures and other functions.
Here is Fred Merritt, Cary Institute Facilities Director checking in on us. Directly above him are the new house right lighting position and “delay” speaker.